- Home
- Departments
- Development
- Engineering
Engineering
The Engineering Office is a division of the Development Department. The Engineering division is responsible for:
- Street Resurfacing
- ADA Sidewalk Ramp Replacement
- Reviewing plans, designs, inspecting and overseeing the construction of public improvement projects
- Reviewing and inspecting private development projects
- Review and approval of permits to work in the right-of-way
Informational Documents
Permit Forms
- Permit - Agricultural Animal, Temporary Custody Request 2019 (PDF)
- Permit - Closing Permit Application (PDF)
- Permit - Downtown Parking Application (PDF)
- Permit - Dumpster Application 2019 (PDF)
- Permit - Oversize Vehicle Application 2019 (PDF)
- Permit - Removal Request-Handicap Parking Space (PDF)
- Permit - Reserved Handicap Parking Space Application (PDF)
- Permit - Right-of-Way Application (PDF)
- Permit - Sewer Connection Application 2019 (PDF)
- Permit - Sidewalk Curb or Curb Cut Application (PDF)
- Permit - Water Connection Application 2019 (PDF)
Bob Graeser
Project ManagerKenton Kiser
Engineering Tech
Email Kenton KiserMelissa Clune
Administrative AssistantEngineering
Physical Address
201 W Water Street
Piqua, OH 45356Phone: 937-778-2044