Linear Park - Phase V Project Photo Gallery
            
 
"Before" Photos
 
"During" Photos
 
NEW!  Photos Added on September 18, 2003  NEW!
 

Phase V of the Linear Park is scheduled for completion in 2003.  This section will connect the completed portions of the Linear Park.  This new phase will start at the Water Plant and will end at Lock Nine Park.  A grant from ODNR is being used for this section.  This phase of the project is being built by city employees with only a small portion of the project (some concrete work) being completed by others.

This phase will be approximately 4.5 miles in length.  It is located along the former Miami and Erie Canal tow path (north of town) and along the Great Miami River.  On the portion of the pathway that runs along Riverside Drive, it will be located in a cut of levee of the Great Miami River with a retaining wall along that entire distance (approximately 2000 feet).

This section of the Linear Park will pass under three roadways with no grade conflict and over three waterways.  This section will also include a scenic overlook of the river and a view of the Miami and Eerie Canal Guard lock.

Once Phase V of the Linear Park is completed, the Linear Park will have more than 12 miles of asphalt-paved pathway dedicated to pedestrians, bikers and skaters.
 
 
To see a larger photo, click on one of the photos below:
 
"Before" Photos: Some of the areas for Phase V before any work began
 
0415_brush_trees.jpg (181090 bytes) 0506_riverbank_concrete.jpg (72153 bytes) 0506_woods_at_river.jpg (129826 bytes)
April 15, 2003
Brush and Trees Will Need
To Be Cleared For New Phase
of Linear Park 
May 6, 2003
View of River With 
Concrete Revetment -
Path Will Be Located at Top of Concrete
May 6, 2003
Woods Where Path Will Join River Bank
     
0509_under_main_street_bridge.jpg (89792 bytes) 0509_riverbank_endofspring.jpg (71204 bytes) 0509_under_ash_street_bridge.jpg (89050 bytes)
May 9, 2003
Path Will Go Along River
Flood Plain and Then Come
Up River Bank to Tie Into Path at 
Lock Nine Park
(Part of Railroad Can Be Seen
at the Right of the Photo)
May 9, 2003
Path Will Be Located On
Lower Portion of River Bank
Between Main Street Bridge
and Lock Nine Park
(Main Street Bridge
Seen in Photo)
May 9, 2003
Path Will Be Located On
Lower Portion of River Bank
Between Main Street Bridge
and Lock Nine Park
(Ash Street - US 36 Bridge
Seen in Photo)
     
"During" Photos: Building Phase V of the Linear Park
     
0415_dozer_gravel_base.jpg (125671 bytes) 0502_pipes_to_be_used.jpg (81168 bytes) 0502_excavating_for_pipes.jpg (133792 bytes)
April 15, 2003
After the Brush & Trees Are Cleared - A Stone Base Is Built
May 2, 2003
Some of the Pipes To Be Used
At Low Water Crossings
May 2, 2003
Excavating for Pipe Installation at Low Water Crossing #2
     
0506_along_river.jpg (144498 bytes) 0506_pathway_cutinhill.jpg (159531 bytes) 0506_roadside_park_dirtpath.jpg (143647 bytes)
May 6, 2003
Different Clearings Along the
Path Will Allow
 Scenic views of the River
May 6, 2003
Stone Base In Place
(Pathway Cut Into Hill
at Left Side of Photo)
May 6, 2003
Preparing the Roadside Park for the Path Installation
     
0506_under_66_working.jpg (164583 bytes) 0508_working_under66.jpg (101728 bytes) 0513_wall_work_base.jpg (156243 bytes)
May 6, 2003
Working on the Portion of the Path That Will Go Under the
State Route 66 Bridge
May 8, 2003
The Path Under State Route 66 Being Worked On
May 13, 2003
Working on the Path Under
State Route 66 -- Retaining
Wall (right) Beginning to be Built
     
0515_wall_cutting.jpg (110500 bytes) 0515_pathway_curveatriver.jpg (174914 bytes) 0516_low_water_area.jpg (166889 bytes)
May 15, 2003
Working on the Retaining Wall
Under the State Route 66 Bridge
May 15, 2003
Path Will Follow the River Along
A Majority of This Phase 
May 16, 2003
Low Water Crossing #2
Ready for Pipes To Be Installed
       
0516_low_water_pipes_installation.jpg (170914 bytes) 0528_low_water_pipes_installed.jpg (185241 bytes) 0528_paved_under66.jpg (138178 bytes)
May 16,2003
Installing Pipes at Low
Water Crossing #2 
May 28, 2003
Pipes Installed at Low
Water Crossing #2
May 28, 2003
Pathway Under State Route 66
Bridge Now Paved - Retaining
Wall Completed
     
0528_roadside_paving.jpg (128058 bytes) 0605_paved.jpg (121138 bytes) 0605_paving.jpg (132005 bytes)
May 28, 2003
Paving the Pathway Through
the Roadside Park
June 5, 2003
A Portion of the Pathway
Through the Woods
Along the River Paved
June 5, 2003
A Portion of the Pathway
Through the Woods
Along the River Being Paved
     
0606_low_water_working.jpg (161088 bytes) 0612_outofwoods.jpg (148924 bytes) 0612_river_bank.jpg (146711 bytes)
June 6, 2003
Working at Low Water
Crossing #1
  June 12, 2003
Woods Where Path Will Join River Bank -- Portion of River Bank Cut Away For Path
(See May 6 Photo for "Before")
 June 12, 2003
Cutting Away Levee for Path - 
Cut is Immediately Above
Concrete Revetment
     
0617_path_end.jpg (64263 bytes) 0617_path_end_back.jpg (86884 bytes) 0618_using_dirt.jpg (73718 bytes)
June 17, 2003
Work Continues on River Levee -
Work On Cut In Levee Is
Progressing Toward
Main Street Bridge
June 17, 2003
Looking Back Towards
Woods to View Portion of
River Levee Where
"Cut" Has Occurred
 June 20, 2003
Some of the Dirt Being
Removed From "Cut" In Levee
Is Being Used On the
Portion Between Main Street
and Ash Street Bridges
     
0620_path_east of_main_st_bridge.jpg (136013 bytes)  0630_path_at_66.jpg (137170 bytes) 0630_path_woods.jpg (149082 bytes)
June 20, 2003
Path Base Being Built
East of the Main Street Bridge -
Will Go Under Bridge
  July 1, 2003
Path Construction From
Parking Lot at Water Plant
July 1, 2003
Path Being Built
Through Wooded Area
     
0630_path_woods_2.jpg (139240 bytes) 0630_along_river_bank.jpg (70681 bytes) 0701_river_grading.jpg (106853 bytes)
July 1, 2003
Path Cuts Through
Wooded Area - 
Pipes and Stone Installed
Beneath Path Can Be Seen
In Photo
July 1, 2003
Work Continues on River Levee -
Work On Cut In Levee Is
Progressing Toward
Main Street Bridge
July 1, 2003
Grading the Portion of the
Path Cut Into River Levee
     
0701_path_east_of_mainstreet_bridge.jpg (114857 bytes) 0701_path_looking_east.jpg (70718 bytes) 0701_path_up_to_lock9.jpg (128830 bytes)
July 1, 2003
East of Main Street Bridge the
Path Will Rise Up From
Flood Plain to Connect to
Path Cut Into Levee
July 1, 2003
Base For Path Can Be Seen Along River
Below Lock Nine Park
June 20, 2003
Path Will Go Up the
River Bank and Connect to
Current Linear Park at
Lock Nine Park
     
0701_path_up_to_lock9_2.jpg (111071 bytes)  p7170001_600.jpg (148498 bytes)   p7170004_600.jpg (112485 bytes)
July 1, 2003
Path Base Can Be Seen
Along River Flood Plain and Coming Up River Bank to Tie
Into Path at Lock Nine Park
(First May 9, 2003 "Before"
Photo Is From This
Same Angle)
  July 17, 2003
Working on Path Along
River Levee
(Wall Being Built Can Be Seen
In Lower Left Portion of Photo) 
  July 17, 2003
Working on Wall Along
River Levee -
Back Filling Behind Wall
     
p7170006_600.jpg (131753 bytes) p7170009_600.jpg (114521 bytes) p7170010_600.jpg (104496 bytes)
July 17, 2003
Working on Wall Along
River Levee -
First (Bottom) Row Must Be
Level and Straight
July 17, 2003
The Wall Along the Path
Coming Out of the Woods
Is In Place
July 17, 2003
Back Filling Behind the Wall
     
p7170011_600.jpg (157727 bytes) p7170013_600.jpg (130251 bytes) p7170014_600.jpg (109579 bytes)
July 17, 2003
Geogrid Material Will Be Used
To Help Strengthen and
Stabilize the Wall
July 17, 2003
Putting the Geogrid Material In
Place - Geogrid Material Being
Placed Every Two
Rows of Stones
July 17, 2003
Back Filling and Tamping Down
Behind the Wall
     
p7170018_600.jpg (146070 bytes)  0725_forms.jpg (124174 bytes)   0725_forms2.jpg (121336 bytes)
July 17, 2003
Stones Being Put In Place on the Wall
 July 25, 2003
Moving of
Water Main In Progress
 July 25, 2003
Water Main Moved - 
Forms for Concrete In Place
     
0725_water_main1.jpg (124657 bytes) 0725_water_main_concrete.jpg (134765 bytes) 0725_geogrid.jpg (140745 bytes)
July 25, 2003
Water Main Moved - 
Concrete Poured
July 25, 2003
Water Main Moved - 
Concrete Poured
July 25, 2003
Geogrid Material
(Used To Stabilize Wall & Levee)
Is In Place for This Section
     
0725_wall_work.jpg (119339 bytes) 0725_wall_work_chain.jpg (137861 bytes)  p7290002_600.jpg (112806 bytes)
July 25, 2003
Adding the Next Level
July 25, 2003
Machinery Helps the Process
  July 30, 2003
Making Sure the
Bottom Row is Level is Critical
     
p7290004_600.jpg (87930 bytes) p7290005_600.jpg (88629 bytes) p7290006_600.jpg (83780 bytes)
July 30, 2003
Making Sure the
Bottom Row is Level is
Critical and Time-Consuming
July 30, 2003
Blocks and Rows
Continue to be
Added to the Wall
July 30, 2003
View of the Wall
As You Come Out of the Woods
     
p7290007_600.jpg (155025 bytes) p8060002.jpg (119066 bytes)  p8060003.jpg (142727 bytes)
July 30, 2003
View of the Wall
As You Look Back
Into the Woods
 August 6, 2003
Cleaning Up the Path Base
Along the Wall
 August 6, 2003
One Row Needs Cleaned Off
Before the Next Row is Added
      
p8060004.jpg (100419 bytes) p8060005.jpg (113425 bytes) p8060007.jpg (107523 bytes)
August 6, 2003
Placing More Stones On the
Wall
August 6, 2003
A Quick Break
To Smile For the Camera ...
August 6, 2003
... And Then Back To Work
Placing More Stones
     
p8060010.jpg (124193 bytes) p8060011.jpg (120642 bytes)  p8110016_600.jpg (96377 bytes)
August 6, 2003
Wall is Progressing Toward the Main Street Bridge
August 6, 2003
Most of the Wall In Place
Has Been Backfilled
  August 11, 2003
Most of the Wall Has Reached At Least Seven Rows
        
p8110017_600.jpg (111936 bytes) p8110020_600.jpg (192967 bytes) p8110021_600.jpg (96432 bytes)
August 11, 2003
Wall In Place Along
Much of the Levee
(Entrance to Wooded Area
Seen In Distance)
August 11, 2003
Area Dug Out for Installing
Base Row of Wall
August 11, 2003
Adding Another 3 Stones to the
Top of the Wall
     
p8130003_600.jpg (112909 bytes) p8130004_600.jpg (89655 bytes) p8150007_600.jpg (103058 bytes)
August 13, 2003
Placing Gravel On Blocks
August 13, 2003
Continuing to Progress Toward
Main Street Bridge
August 15, 2003
Another Load of Gravel
Brought In
     
p8150010_600.jpg (95696 bytes) 0818_cleaning_top_600.jpg (100888 bytes)  0818_stone_work_600.jpg (130337 bytes)
August 15, 2003
Loading Equipment in Truck for
Removal From Work Site
 August 19, 2003
Cleaning Off Stones Before
Next Level Can Be Placed
 August 19, 2003
Stones Being Connected for
Lifting Up to Wall
         
0818_stones_delivered_600.jpg (114197 bytes) 0818_wall_work_600.jpg (132806 bytes) 0819_dirt_moving_600.jpg (158903 bytes)
 August 19, 2003
Delivering More Stones
August 19, 2003
Three More Stones In Place
August 19, 2003
Excavation Work Under the
Main Street Bridge
     
0819_eastofbridge_600.jpg (67684 bytes) 0819_smoothing_600.jpg (144824 bytes) 0819_wall_work_600.jpg (123109 bytes)
August 19, 2003
Excavation Work On the
East Side of the
Main Street Bridge
August 19, 2003
Excavation Work on the
Path Area Just West of the
Main Street Bridge
August 19, 2003
Adding More Stones to the Wall
     
0819_work_equipment_600.jpg (101646 bytes) p8220002_600.jpg (117476 bytes)   p8220004_600.jpg (103299 bytes)
August 19, 2003
Working on the Path Area
East of the Main Street Bridge
 August 25, 2003
The Wall Has Reached the
Main Street Bridge
 August 25, 2003
The Wall Has Reached the
Main Street Bridge
(Looking East Toward Bridge)
     
p8220006_600.jpg (95133 bytes) p8220009_600.jpg (119989 bytes)  phase5_9040002_600.jpg (112300 bytes)
August 25, 2003
As the Wall Goes Up -
Back-filling Continues
August 25, 2003
The Levee Area East of the
Main Street Bridge is
Being Prepared for
Installation of a Wall 
 September 4, 2003
The Top Row Has Been Placed
On Some Portions of the Wall -
Backfilling Still Needs to
Occur Behind Wall 
        
phase5_9040003_600.jpg (87484 bytes) phase5_9040009_600.jpg (97426 bytes) phase5_9040012_600.jpg (139191 bytes)
September 4, 2003
A Truck Delivers Material To Be
Used for Backfill Process 
September 4, 2003
Building the Wall
(Slightly West of
Main Street Bridge) 
September 4, 2003
Building of the Wall
East of the
Main Street Bridge
Has Started 
          
09080008_rock_chucker1.jpg (102494 bytes) 09080006_rock_chucker2.jpg (123636 bytes) 09080004_cap_on_wall.jpg (116810 bytes)
September 8, 2003
Rock Chucker "Chucks"
Rocks Onto and Behind
Wall to Help Stabilize It
September 8, 2003
Rock Chucker "Chucks"
Rocks Onto and Behind
Wall to Help Stabilize It
September 8, 2003
A Large Portion of the Wall
Now Has the "Cap" Row
In Place - Back Filling
Still Needs to Occur
        
09080001_pick_up_blocks.jpg (98693 bytes) 09080002_wall_east.jpg (107119 bytes) 09080003_wall1.jpg (112581 bytes)
September 8, 2003
Hooking  Up the Stones To Be
Placed On Wall East of Main Street Bridge
September 8, 2003
Building Wall East of
Main Street Bridge
September 8, 2003
Building Wall East of
Main Street Bridge
      
09080011_wall_sweep.jpg (143862 bytes) p9120012_wall_east.jpg (130144 bytes)  p9120013_wall_east.jpg (73958 bytes)
September 8, 2003
Cleaning Off the Wall East of
Main Street Bridge -
Preparing for Next Level to be Placed
 September 12, 2003
The Wall East of the
Main Street Bridge is
Completed
 September 12, 2003
The Wall East of the
Main Street Bridge is
Completed
(Viewed from Under Bridge)
      
p9120011_path_base.jpg (85100 bytes) p9120003_path_down_from _lock9.jpg (71996 bytes) p9120007_dumping_dirt.jpg (88182 bytes)
September 12, 2003
Path Base Heading East
Toward Ash Street / US 36
From Main Street 
September 12, 2003
Path Base Heading East
Toward Ash Street / US 36
From Lock Nine Park
September 12, 2003
Dumping Dirt to Build Up
Path Base
     
p9120010_driver.jpg (57604 bytes) p9120009_bulldozer.jpg (102951 bytes) p9120006_buildup.jpg (111567 bytes)
September 12, 2003
One of Piqua's Loyal Workers
Off to Pick Up Another
Load of Dirt
September 12, 2003
Bulldozing Dirt to Build Up
Path Base
September 12, 2003
Path Base Built Up
     
p9160001_connect_to_path.jpg (100051 bytes) p9160003_asphalt_path.jpg (72607 bytes) p9160005_laying_asphalt.jpg (91122 bytes)
September 16, 2003
Paving Has Started on
Phase V at Lock Nine Park -
New Section Will Tie In To
Existing Path
September 16, 2003
Portion of Path Has Intermediate
Course In Place
September 16, 2003
Laying the Intermediate
Course of Asphalt
     
p9160022_laying_asphalt.jpg (111204 bytes) p9160004_driver.jpg (78227 bytes) p9160007_roller.jpg (97263 bytes)
September 16, 2003
Laying the Intermediate
Course of Asphalt -
Top Course Will Be Applied Later
September 16, 2003
One of the Trucks and Driver
Delivering Intermediate Course
Asphalt To Paving Machine
September 16, 2003
Rolling the Asphalt
     
p9160013_checking_depth.jpg (99519 bytes) p9160024_roller.jpg (94684 bytes) p9180002_600.jpg (79874 bytes)
September 16, 2003
Checking the Depth of the
Applied Asphalt
September 16, 2003
Rolling the Asphalt
  September 18, 2003
Intermediate Course of Asphalt
Has Been Placed East of
Main Street Bridge
     
p9180003_600.jpg (71088 bytes) p9180006_600.jpg (87759 bytes) 0919_path_stone_base.jpg (97397 bytes)
September 18, 2003
Pavement Continues Along the River East From Bridge
September 18, 2003
Paving Along River - Behind the Former Aerovent Building
(Photo Taken From
US 36 / Ash Street Bridge)
 September 19, 2003 (NEW)
Wall Completed Where Path
Enters Woods Along River Bank
     
0919_path_from_lock9.jpg (89625 bytes) 0919_pavement_at_wall_beginning.jpg (119925 bytes) 0919_north_from_riverbank_paving.jpg (121978 bytes)
September 19, 2003 (NEW)
View of Phase V
From Lock Nine Park
September 19, 2003 (NEW)
Intermediate Course of Asphalt
Has Been Laid Where Path
Enters Woods Along River Bank
September 19, 2003 (NEW)
Intermediate Course of Asphalt
Being Laid
     
0919_paving_operator.jpg (106753 bytes) 0919_path_thru_woods.jpg (168718 bytes) 0919_river_view.jpg (139626 bytes)
September 19, 2003 (NEW)
Paver Operator Keeps An
Eye on the Path
September 19, 2003 (NEW)
Through the Wooded Area
Along the Great Miami River
September 19, 2003 (NEW)
View of River From
Linear Park - Phase V
Rest Area
     
0919_gate.jpg (105503 bytes) 0930_path_at_waterplant.jpg (133996 bytes) 0930_parking_lot_roadside.jpg (110126 bytes)
September 19, 2003 (NEW)
Gate Installed at
Roadside Park Area
September 30, 2003 (NEW)
Path From Parking Lot at
Water Plant - Goes Under
St. Rt. 66
September 30, 2003 (NEW)
Parking Lot at Roadside Park -
Newly Paved and Lined
     
  0930_painting_roadside.jpg (92383 bytes)  0930_fence_working.jpg (80525 bytes)  0930_view_of_fence_from_riverpath.jpg (103287 bytes)
September 30, 2003 (NEW)
Sprucing Up
Roadside Park Area
September 30, 2003 (NEW)
Split Rail Fence Being Installed
Above Concrete Revetment
September 30, 2003 (NEW)
Split Rail Fence & Wall
Along River Levee
     
 0930_start+paving_at _bridge.jpg (94376 bytes)  0930_paving_along_wall.jpg (94904 bytes)  0930_rolling_east_of_bridge.jpg (74890 bytes)
September 30, 2003 (NEW)
Applying Top Course -
Starting Toward Lock Nine Park
at Main Street Bridge
September 30, 2003 (NEW)
Paving Along Wall Just East of
Main Street Bridge
September 30, 2003 (NEW)
Rolling Top Course Just
East of Main Street Bridge
     
 
Photo Gallery

 

   
 
  Home | Search | Email | Calendar | SiteMap
   
  Copyright © 2001 by the City Of Piqua, Ohio. All rights reserved.
Reproduction in part or whole without written permission is prohibited.
This website is maintained by the City Of Piqua Information Technology Department.
Please address any questions or feedback regarding this site to the Webmaster.

Please read our Disclaimer and Privacy Statement.