| Linear
Park - Phase V Project Photo Gallery |
| |
| |
| "Before"
Photos |
| |
| "During"
Photos |
| |
| NEW!
Photos Added on September 18, 2003 NEW! |
| |
|
|
Phase V of the Linear Park is
scheduled for completion in 2003. This section will
connect the completed portions of the Linear Park. This
new phase will start at the Water Plant and will end at Lock
Nine Park. A grant from ODNR is being used for this
section. This phase of the project is being built by city
employees with only a small portion of the project (some
concrete work) being completed by others.
This phase will be approximately 4.5 miles in length. It
is located along the former Miami and Erie Canal tow path (north
of town) and along the Great Miami River. On the portion
of the pathway that runs along Riverside Drive, it will be
located in a cut of levee of the Great Miami River with a
retaining wall along that entire distance (approximately 2000
feet).
This section of the Linear Park will pass under three roadways
with no grade conflict and over three waterways. This
section will also include a scenic overlook of the river and a view of the
Miami and Eerie Canal Guard lock.
Once Phase V of the Linear Park is completed, the Linear Park
will have more than 12 miles of asphalt-paved pathway dedicated
to pedestrians, bikers and skaters. |
| |
| |
| To see a larger photo, click on
one of the photos below: |
| |
| "Before"
Photos: Some of the areas
for Phase V before any work began |
| |
 |
 |
 |
April
15, 2003
Brush and Trees Will Need
To Be Cleared For New Phase
of Linear Park |
May
6, 2003
View of River With
Concrete Revetment -
Path Will Be Located at Top of Concrete |
May
6, 2003
Woods Where Path Will Join River Bank |
| |
|
|
 |
 |
 |
May
9, 2003
Path Will Go Along River
Flood Plain and Then Come
Up River Bank to Tie Into Path at
Lock Nine Park
(Part of Railroad Can Be Seen
at the Right of the Photo) |
May
9, 2003
Path Will Be Located On
Lower Portion of River Bank
Between Main Street Bridge
and Lock Nine Park
(Main Street Bridge
Seen in Photo) |
May
9, 2003
Path Will Be Located On
Lower Portion of River Bank
Between Main Street Bridge
and Lock Nine Park
(Ash Street - US 36 Bridge
Seen in Photo) |
| |
|
|
| "During"
Photos: Building Phase V of
the Linear Park |
| |
|
|
 |
 |
 |
April
15, 2003
After the Brush & Trees Are Cleared - A Stone Base Is Built |
May
2, 2003
Some of the Pipes To Be Used
At Low Water Crossings |
May
2, 2003
Excavating for Pipe Installation at Low Water Crossing #2 |
| |
|
|
 |
 |
 |
May
6, 2003
Different Clearings Along the
Path Will Allow
Scenic views of the River |
May
6, 2003
Stone Base In Place
(Pathway Cut Into Hill
at Left Side of Photo) |
May
6, 2003
Preparing the Roadside Park for the Path Installation |
| |
|
|
 |
 |
 |
May
6, 2003
Working on the Portion of the Path That Will Go Under the
State Route 66 Bridge |
May
8, 2003
The Path Under State Route 66 Being Worked On |
May
13, 2003
Working on the Path Under
State Route 66 -- Retaining
Wall (right) Beginning to be Built |
| |
|
|
 |
 |
 |
May
15, 2003
Working on the Retaining Wall
Under the State Route 66 Bridge |
May
15, 2003
Path Will Follow the River Along
A Majority of This Phase |
May
16, 2003
Low Water Crossing #2
Ready for Pipes To Be Installed |
| |
|
|
 |
 |
 |
May
16,2003
Installing Pipes at Low
Water Crossing #2 |
May
28, 2003
Pipes Installed at Low
Water Crossing #2 |
May
28, 2003
Pathway Under State Route 66
Bridge Now Paved - Retaining
Wall Completed |
| |
|
|
 |
 |
 |
May
28, 2003
Paving the Pathway Through
the Roadside Park |
June
5, 2003
A Portion of the Pathway
Through the Woods
Along the River Paved |
June
5, 2003
A Portion of the Pathway
Through the Woods
Along the River Being Paved |
| |
|
|
 |
 |
 |
June
6, 2003
Working at Low Water
Crossing #1 |
June
12, 2003
Woods Where Path Will Join River Bank -- Portion of River Bank
Cut Away For Path
(See May 6 Photo for "Before") |
June
12, 2003
Cutting Away Levee for Path -
Cut is Immediately Above
Concrete Revetment |
| |
|
|
 |
 |
 |
June
17, 2003
Work Continues on River Levee -
Work On Cut In Levee Is
Progressing Toward
Main Street Bridge |
June
17, 2003
Looking Back Towards
Woods to View Portion of
River Levee Where
"Cut" Has Occurred |
June
20, 2003
Some of the Dirt Being
Removed From "Cut" In Levee
Is Being Used On the
Portion Between Main Street
and Ash Street Bridges |
| |
|
|
 |
 |
 |
June
20, 2003
Path Base Being Built
East of the Main Street Bridge -
Will Go Under Bridge |
July
1, 2003
Path Construction From
Parking Lot at Water Plant |
July
1, 2003
Path Being Built
Through Wooded Area
|
| |
|
|
 |
 |
 |
July
1, 2003
Path Cuts Through
Wooded Area -
Pipes and Stone Installed
Beneath Path Can Be Seen
In Photo |
July
1, 2003
Work Continues on River Levee -
Work On Cut In Levee Is
Progressing Toward
Main Street Bridge |
July
1, 2003
Grading the Portion of the
Path Cut Into River Levee |
| |
|
|
 |
 |
 |
July
1, 2003
East of Main Street Bridge the
Path Will Rise Up From
Flood Plain to Connect to
Path Cut Into Levee |
July
1, 2003
Base For Path Can Be Seen Along River
Below Lock Nine Park |
June
20, 2003
Path Will Go Up the
River Bank and Connect to
Current Linear Park at
Lock Nine Park |
| |
|
|
 |
 |
 |
July
1, 2003
Path Base Can Be Seen
Along River Flood Plain and Coming Up River Bank to Tie
Into Path at Lock Nine Park
(First May 9, 2003 "Before"
Photo Is From This
Same Angle) |
July
17, 2003
Working on Path Along
River Levee
(Wall Being Built Can Be Seen
In Lower Left Portion of Photo) |
July
17, 2003
Working on Wall Along
River Levee -
Back Filling Behind Wall
|
| |
|
|
 |
 |
 |
July
17, 2003
Working on Wall Along
River Levee -
First (Bottom) Row Must Be
Level and Straight |
July
17, 2003
The Wall Along the Path
Coming Out of the Woods
Is In Place |
July
17, 2003
Back Filling Behind the Wall |
| |
|
|
 |
 |
 |
July
17, 2003
Geogrid Material Will Be Used
To Help Strengthen and
Stabilize the Wall |
July
17, 2003
Putting the Geogrid Material In
Place - Geogrid Material Being
Placed Every Two
Rows of Stones
|
July
17, 2003
Back Filling and Tamping Down
Behind the Wall |
| |
|
|
 |
 |
 |
July
17, 2003
Stones Being Put In Place on the Wall |
July
25, 2003
Moving of
Water Main In Progress |
July
25, 2003
Water Main Moved -
Forms for Concrete In Place |
| |
|
|
 |
 |
 |
July
25, 2003
Water Main Moved -
Concrete Poured |
July
25, 2003
Water Main Moved -
Concrete Poured |
July
25, 2003
Geogrid Material
(Used To Stabilize Wall & Levee)
Is In Place for This Section |
| |
|
|
 |
 |
 |
July
25, 2003
Adding the Next Level |
July
25, 2003
Machinery Helps the Process |
July
30, 2003
Making Sure the
Bottom Row is Level is Critical |
| |
|
|
 |
 |
 |
July
30, 2003
Making Sure the
Bottom Row is Level is
Critical and Time-Consuming |
July
30, 2003
Blocks and Rows
Continue to be
Added to the Wall |
July
30, 2003
View of the Wall
As You Come Out of the Woods |
| |
|
|
 |
 |
 |
July
30, 2003
View of the Wall
As You Look Back
Into the Woods |
August
6, 2003
Cleaning Up the Path Base
Along the Wall |
August
6, 2003
One Row Needs Cleaned Off
Before the Next Row is Added |
| |
|
|
 |
 |
 |
August
6, 2003
Placing More Stones On the Wall |
August
6, 2003
A Quick Break
To Smile For the Camera ... |
August
6, 2003
... And Then Back To Work
Placing More Stones |
| |
|
|
 |
 |
 |
August
6, 2003
Wall is Progressing Toward the Main Street Bridge |
August
6, 2003
Most of the Wall In Place
Has Been Backfilled |
August
11, 2003
Most of the Wall Has Reached At Least Seven Rows |
| |
|
|
 |
 |
 |
August
11, 2003
Wall In Place Along
Much of the Levee
(Entrance to Wooded Area
Seen In Distance) |
August
11, 2003
Area Dug Out for Installing
Base Row of Wall |
August
11, 2003
Adding Another 3 Stones to the
Top of the Wall |
| |
|
|
 |
 |
 |
August
13, 2003
Placing Gravel On Blocks |
August
13, 2003
Continuing to Progress Toward
Main Street Bridge |
August
15, 2003
Another Load of Gravel
Brought In |
| |
|
|
 |
 |
 |
August
15, 2003
Loading Equipment in Truck for
Removal From Work Site |
August
19, 2003
Cleaning Off Stones Before
Next Level Can Be Placed |
August
19, 2003
Stones Being Connected for
Lifting Up to Wall |
| |
|
|
 |
 |
 |
August
19, 2003
Delivering More Stones |
August
19, 2003
Three More Stones In Place |
August
19, 2003
Excavation Work Under the
Main Street Bridge |
| |
|
|
 |
 |
 |
August
19, 2003
Excavation Work On the
East Side of the
Main Street Bridge |
August
19, 2003
Excavation Work on the
Path Area Just West of the
Main Street Bridge |
August
19, 2003
Adding More Stones to the Wall |
| |
|
|
 |
 |
 |
August
19, 2003
Working on the Path Area
East of the Main Street Bridge |
August
25, 2003
The Wall Has Reached the
Main Street Bridge |
August
25, 2003
The Wall Has Reached the
Main Street Bridge
(Looking East Toward Bridge) |
| |
|
|
 |
 |
 |
August
25, 2003
As the Wall Goes Up -
Back-filling Continues |
August
25, 2003
The Levee Area East of the
Main Street Bridge is
Being Prepared for
Installation of a Wall |
September
4, 2003
The Top Row Has Been Placed
On Some Portions of the Wall -
Backfilling Still Needs to
Occur Behind Wall |
| |
|
|
 |
 |
 |
September
4, 2003
A Truck Delivers Material To Be
Used for Backfill Process |
September
4, 2003
Building the Wall
(Slightly West of
Main Street Bridge) |
September
4, 2003
Building of the Wall
East of the
Main Street Bridge
Has Started |
| |
|
|
 |
 |
 |
September
8, 2003
Rock Chucker "Chucks"
Rocks Onto and Behind
Wall to Help Stabilize It |
September
8, 2003
Rock Chucker "Chucks"
Rocks Onto and Behind
Wall to Help Stabilize It |
September
8, 2003
A Large Portion of the Wall
Now Has the "Cap" Row
In Place - Back Filling
Still Needs to Occur |
| |
|
|
 |
 |
 |
September
8, 2003
Hooking Up the Stones To Be
Placed On Wall East of Main Street Bridge |
September
8, 2003
Building Wall East of
Main Street Bridge |
September
8, 2003
Building Wall East of
Main Street Bridge |
| |
|
|
 |
 |
 |
September
8, 2003
Cleaning Off the Wall East of
Main Street Bridge -
Preparing for Next Level to be Placed |
September
12, 2003
The Wall East of the
Main Street Bridge is
Completed |
September
12, 2003
The Wall East of the
Main Street Bridge is
Completed
(Viewed from Under Bridge) |
| |
|
|
 |
 |
 |
September
12, 2003
Path Base Heading East
Toward Ash Street / US 36
From Main Street |
September
12, 2003
Path Base Heading East
Toward Ash Street / US 36
From Lock Nine Park |
September
12, 2003
Dumping Dirt to Build Up
Path Base |
| |
|
|
 |
 |
 |
September
12, 2003
One of Piqua's Loyal Workers
Off to Pick Up Another
Load of Dirt |
September
12, 2003
Bulldozing Dirt to Build Up
Path Base |
September
12, 2003
Path Base Built Up |
| |
|
|
 |
 |
 |
September
16, 2003
Paving Has Started on
Phase V at Lock Nine Park -
New Section Will Tie In To
Existing Path |
September
16, 2003
Portion of Path Has Intermediate
Course In Place |
September
16, 2003
Laying the Intermediate
Course of Asphalt |
| |
|
|
 |
 |
 |
September
16, 2003
Laying the Intermediate
Course of Asphalt -
Top Course Will Be Applied Later |
September
16, 2003
One of the Trucks and Driver
Delivering Intermediate Course
Asphalt To Paving Machine |
September
16, 2003
Rolling the Asphalt |
| |
|
|
 |
 |
 |
September
16, 2003
Checking the Depth of the
Applied Asphalt |
September
16, 2003
Rolling the Asphalt |
September
18, 2003
Intermediate Course of Asphalt
Has Been Placed East of
Main Street Bridge |
| |
|
|
 |
 |
 |
September
18, 2003
Pavement Continues Along the River East From Bridge |
September
18, 2003
Paving Along River - Behind the Former Aerovent Building
(Photo Taken From
US 36 / Ash Street Bridge) |
September
19, 2003 (NEW)
Wall Completed Where Path
Enters Woods Along River Bank |
| |
|
|
 |
 |
 |
September
19, 2003 (NEW)
View of Phase V
From Lock Nine Park |
September
19, 2003 (NEW)
Intermediate Course of Asphalt
Has Been Laid Where Path
Enters Woods Along River Bank |
September
19, 2003 (NEW)
Intermediate Course of Asphalt
Being Laid |
| |
|
|
 |
 |
 |
September
19, 2003 (NEW)
Paver Operator Keeps An
Eye on the Path |
September
19, 2003 (NEW)
Through the Wooded Area
Along the Great Miami River |
September
19, 2003 (NEW)
View of River From
Linear Park - Phase V
Rest Area |
| |
|
|
 |
 |
 |
September
19, 2003 (NEW)
Gate Installed at
Roadside Park Area |
September
30, 2003 (NEW)
Path From Parking Lot at
Water Plant - Goes Under
St. Rt. 66 |
September
30, 2003 (NEW)
Parking Lot at Roadside Park -
Newly Paved and Lined |
| |
|
|
 |
 |
 |
September
30, 2003 (NEW)
Sprucing Up
Roadside Park Area |
September
30, 2003 (NEW)
Split Rail Fence Being Installed
Above Concrete Revetment |
September
30, 2003 (NEW)
Split Rail Fence & Wall
Along River Levee |
| |
|
|
 |
 |
 |
September
30, 2003 (NEW)
Applying Top Course -
Starting Toward Lock Nine Park
at Main Street Bridge |
September
30, 2003 (NEW)
Paving Along Wall Just East of
Main Street Bridge |
September
30, 2003 (NEW)
Rolling Top Course Just
East of Main Street Bridge |