Public
Works Improvement Projects |
| |
|
| |
Completed
the design and construction of Staunton Street
Reconstruction Project from Second Street to Third Street. |
| |
Began
construction on the joint city/county County Road 25-A
Reconstruction Project from the Great Miami River to
Country Club Road. |
| |
Completed
the design and construction of the 2007 Street Resurfacing
Project. |
| |
Began
construction on the Fort Piqua Hotel Restoration Project |
| |
Completed
the Hollow Park Bike Path Resurfacing Project. |
|
|
Continued
design work on the East Ash Street Reconstruction Project
from Spring Street to the Great Miami River Bridge.
Hired a consultant to complete the Environmental
Services portion of the Project.
Hired a consultant to begin the Right-of-Way
Acquisition portion of the project. |
| |
|
| |
Private
Development Improvement Projects |
| |
|
| |
Provided
construction inspection for the Aldis Sanitary Sewer
Extension Project located on East Ash Street. |
| |
Provided
construction inspection for the sanitary sewer and water
extension for the Quality Forms Utility Extension Project
located on West US Route 36. |
| |
Reviewed
the construction plans for the proposed Swift Run Estates
Subdivision Section One. |
| |
|
|
Engineering
Department Projects |
| |
|
| |
Submitted
the City of Piquas Storm Water Management Plan (SWMP)
to the Ohio EPA as part of the Phase II Storm Water
Requirements. |
| |
Continued
working on updating the Utility Maps. |
| |
Continued
working on updating the Master Tree Plan for the City of
Piqua. |
| |
Installed
500 Storm Drain Markers on catch basins throughout the
city to satisfy a segment of the Phase II Storm Water
Requirements |
| |
Conducted
two City-wide Tree Plantings.
Thirty trees were planted as part of the Spring
Tree Planting and forty-three trees were planted as part
of the Fall Tree Planting. |
| |
|
| |
2007
Engineering Department Permit Activity |
| |
|
|
Permit
Type |
Number
Issued |
| |
|
|
| |
Curb/Sidewalk/Driveway |
86 |
| |
Dumpster
Permit |
21 |
| |
Oversize
Vehicle Permit |
0 |
| |
Parade
Permit |
8 |
| |
Street and
Alley Closing |
40 |
| |
Reserved
Handicap Parking Space |
16 |
| |
Right of Way
Opening |
100 |
| |
Water Tap |
13 |
| |
Request
for Temporary Custody of Agricultural Animals |
1 |
| |
Permit to
Block Way |
37 |
| |
Subdivision
Construction Plan |
1 |
| |
|
|
|
2008
Major Goals |
|
|
|
|
Public
Works Improvement Projects |
|
|
|
| |
Continue
working on the design of the East Ash Street
Reconstruction Project to be constructed in 2011. |
| |
Contract
with a consultant to begin developing a Storm Water
Utility. |
| |
Contract
with a consultant to begin the design of the Broadway
Avenue (S.R. 66) Reconstruction Project for construction
in 2009. |
| |
Complete
the construction inspection for the Fort Piqua Hotel
Restoration Project. |
| |
Complete
the design and construction of the 2008 Street Resurfacing
Project. |
| |
Hire
a contractor to complete the design/build of the Great
Miami Recreational Trail Project in conjunction with the
Miami County Park District |